Analysis · Southwest Florida · Wednesday, October 7, 2026

SW Florida millwork: Rates up, permits issued, buyout now

Outlook: Holding-9Composite on a -100 to 100 scale, from 12 weighted indicators. As of 2026-10-07.
  • 10-year Treasury at 4.99%, up 6.6% m/m, delays private bids.
  • Nonres spending up 2.0% over 3 months, institutional projects moving.
  • Plywood PPI up 3.3% over 3 months, lock in material prices early.

What moved

The 10-year Treasury yield rose to 4.99%, up 6.6% month over month. This increase signals tighter financing conditions for private developers. Nonresidential spending rose 2.0% over three months, indicating steady demand for institutional projects. Office spending surged 13.3% over three months, suggesting a recovery in office interiors. The architecture billings index fell to 47.2, below the 50 threshold, indicating that design firms are seeing fewer new projects. This lag means that the current bid pipeline is thinning, but the projects already in the ground are moving.

What it means in Southwest Florida

For a Southwest Florida millwork shop, the next two quarters will be driven by the projects already in the ground. The $97M Naples hotel and the $23M Naples condo are both in the buyout phase, with GCs named. These projects will require custom casework, lobby millwork, and entry features. The Naples Community Hospital alteration and the Rookery Bay Sanctuary project are also in the buyout phase. These healthcare and civic projects carry heavy casework and wall panel scope. The rising office spending suggests that the $24M FineMark office building acquisition will lead to interior work. The flat education spending means that the Ave Maria University project is an exception. The shop should focus on the issued permits where GCs are already named, like Deangelis Diamond and Suffolk. These projects are in buyout, not design. The rising plywood PPI, up 3.3% over three months, means material costs are increasing. Lock in prices early.

Costs

The plywood PPI is up 3.3% over three months, and the cabinet PPI is up 3.6% over three months. These increases mean that material costs are rising. The softwood lumber PPI is up 5.1% over three months, which affects framing but also moves with tariffs. The millwork PPI is down 0.3% over three months, but this is likely due to a mix of factors. The 10-year Treasury yield is at 4.99%, which affects financing costs for developers. Higher rates delay private projects, but public and institutional projects are less affected. The shop should carry a higher material cost in bids and lock in prices early. The rising rates also mean that the cost of capital is higher, which affects the shop's own financing.

What we are watching

The next architecture billings report will show if the decline continues. The nonresidential spending trend will show if institutional projects continue to move. The plywood PPI will show if material costs continue to rise.

Numbers from the sources linked in the table below. The prose is our read, written around the stored indicator table and nothing else. Arrows read through what is good for a millwork shop: rising costs point down.

The indicators

Every series behind this read

Indicator pages

Each line is the last 24 months. Values and changes are from the source linked. Arrows read through what is good for a millwork shop: rising costs point down.

Demand ahead

Architecture billings
AIA / Deltek · Aug 2026
47.2Down, below 50, 46.6 prior
Dodge Momentum288.0Up, +2.1% m/m
Contractor backlog8.5 moFlat, n/a m/m

Activity now

Nonres spending
Census via FRED · Aug 2026
$1309BUp, +0.7% m/m, +0.5% y/y
Office
Census via FRED · Aug 2026
$151BUp, +3.9% m/m, +24.6% y/y
Healthcare
Census via FRED · Aug 2026
$75.8BUp, +0.4% m/m, -3.0% y/y
Education
Census via FRED · Aug 2026
$137BFlat, 0.0% m/m, -0.5% y/y
Lodging
Census via FRED · Aug 2026
$24.9BDown, -0.3% m/m, -10.0% y/y
Commercial
Census via FRED · Aug 2026
$123BFlat, -0.2% m/m, -5.4% y/y

Your costs

Millwork PPI
BLS via FRED · Aug 2026
195.8Down, -0.7% m/m, +1.7% y/y
Cabinet PPI
BLS via FRED · Aug 2026
288.0Flat, 0.0% m/m, +4.3% y/y
Plywood PPI
BLS via FRED · Aug 2026
248.1Up, +1.2% m/m, +9.6% y/y
Softwood lumber
BLS via FRED · Aug 2026
294.9Down, -1.9% m/m, +11.8% y/y
Laminate PPI
BLS via FRED · Aug 2026
231.1Flat, 0.0% m/m, +3.9% y/y

Money

10-year Treasury4.99%Up, +6.6% m/m, +21.1% y/y