SW Florida millwork: Rates up, permits issued, buyout now
- 10-year Treasury at 4.99%, up 6.6% m/m, delays private bids.
- Nonres spending up 2.0% over 3 months, institutional projects moving.
- Plywood PPI up 3.3% over 3 months, lock in material prices early.
What moved
The 10-year Treasury yield rose to 4.99%, up 6.6% month over month. This increase signals tighter financing conditions for private developers. Nonresidential spending rose 2.0% over three months, indicating steady demand for institutional projects. Office spending surged 13.3% over three months, suggesting a recovery in office interiors. The architecture billings index fell to 47.2, below the 50 threshold, indicating that design firms are seeing fewer new projects. This lag means that the current bid pipeline is thinning, but the projects already in the ground are moving.
What it means in Southwest Florida
For a Southwest Florida millwork shop, the next two quarters will be driven by the projects already in the ground. The $97M Naples hotel and the $23M Naples condo are both in the buyout phase, with GCs named. These projects will require custom casework, lobby millwork, and entry features. The Naples Community Hospital alteration and the Rookery Bay Sanctuary project are also in the buyout phase. These healthcare and civic projects carry heavy casework and wall panel scope. The rising office spending suggests that the $24M FineMark office building acquisition will lead to interior work. The flat education spending means that the Ave Maria University project is an exception. The shop should focus on the issued permits where GCs are already named, like Deangelis Diamond and Suffolk. These projects are in buyout, not design. The rising plywood PPI, up 3.3% over three months, means material costs are increasing. Lock in prices early.
Costs
The plywood PPI is up 3.3% over three months, and the cabinet PPI is up 3.6% over three months. These increases mean that material costs are rising. The softwood lumber PPI is up 5.1% over three months, which affects framing but also moves with tariffs. The millwork PPI is down 0.3% over three months, but this is likely due to a mix of factors. The 10-year Treasury yield is at 4.99%, which affects financing costs for developers. Higher rates delay private projects, but public and institutional projects are less affected. The shop should carry a higher material cost in bids and lock in prices early. The rising rates also mean that the cost of capital is higher, which affects the shop's own financing.
What we are watching
The next architecture billings report will show if the decline continues. The nonresidential spending trend will show if institutional projects continue to move. The plywood PPI will show if material costs continue to rise.